- Project: Buckingham Township Water & Wastewater Dept Facility
- Completed: June 2021
- Location: Buckingham, PA
- Architect: KCBA Architects
- Description: Hollenbach will furnish and erect the new 9,000 SF pre-engineered metal building which will be the service/maintenance garage for the township’s water
Category Archives: Commercial
- Project: Ambler Savings Bank – Bally Renovations
- Completed: April 2019
- Location: Bally, PA
- Architect: Phillips Associates
- Description: Addition of a new drive-thru canopy and associated interior renovations to the bank teller area.
- Project: Drug Plastics & Glass – Phase 2 Clean Room Construction
- Completed: June 2019
- Location: Boyertown, PA
- Description: Phase 1 – Approximate 35′ x 70′ mold storage room constructed within the existing warehouse. Phase 2 – Demo of existing mold
- Project: Waste Management Compressed Natural Gas Fueling Station
- Completed: December 2018
- Location: Gilbertsville, PA
- Designer: T. Mitchell Engineers & Associates
- Description: Sitework and concrete work for installation of compressor equipment and fueling stations. Installation of a steel truss structure for
- Project: BB&T Administrative Office Remodel
- Completed: July 2018
- Location: Allentown, PA
- Architect: Little Diversified Architectural Consulting
- Description: Approximately 12,000 SF renovations to the 9th & 10th floor administrative offices for BB&T. The project is located in the Two City Center
- Project: Boyertown Museum of Historic Vehicles – LULA Elevator Installation
- Completed: Summer 2018
- Location: Boyertown, PA
- Architect: Lee Architectural Associates
- Description: Installation of a LULA lift/elevator.
- Project: Boyertown Museum of Historic Vehicles – Hafer Building Renovations
- Completed: Summer 2018
- Location: Boyertown, PA
- Architect: Lee Architectural Associates
- Description: