- Project: Fred Beans Collision Center Addition
- Anticipated Completion: Fall 2024
- Location: Boyertown, PA
- Designer: James Necker Architect
- Description: Modifications to the existing building to accommodate new paint booth; 1,764 SF pre-engineered metal building addition to allow for (5) additional repair
- Project: Taylor Northeast Building Improvements
- Anticipated Completion: March 2024
- Location: Allentown, PA
- Description: Install structure for new overhead doors; Remove existing deteriorated/damaged siding and install new siding with insulation system and liner panel on the entire building.
- Project: Borough of Quakertown – Memorial Park Stadium Reconstruction
- Anticipated Completion: Spring 2024
- Location: Quakertown, PA
- Designer: Cowan Associates, Inc.
- Description: Complete tear-down and rebuild of the Memorial Park Baseball Stadium. Work includes new structural steel, masonry, and precast concrete
- Project: Glen Mills Senior Living Interior Renovations
- Completed: December 2022
- Location: Glen Mills, PA
- Designer: KGD Architecture
- Description: Upgrades to the common areas throughout the building including new casework, flooring, ceilings, paint, and LED lighting. Conversion of existing rooms to
- Project: Exton Senior Living Interior Renovations
- Completed: November 2022
- Location: Exton, PA
- Designer: KGD Architecture
- Description: Upgrades to the common areas throughout the building including new casework, flooring, ceilings, paint, and LED lighting. Conversion of existing rooms to create new
- Project: Gayman Elementary School Canopy Repairs
- Completed: July 2022
- Location: Doylestown, PA
- Architect: Godshall Kane O’Rourke Architects, LLC
- Description: Removal and replacement of the existing building canopy.